Post by canton1 on Mar 12, 2004 4:21:55 GMT -5
*****************New Tanker******************
2005 Mack Granite 4-GUYS
Mack 427 HP Motor
Automatic Transmission
Aluminum Wheels
LED Clearance Lights
4000 Gallons (Elliptical)
1250 GPM Pump
2 1/2" Front Discharge
3 " rear Discharge
10" Newton Dumps Side and Rear with 18" extensions
(Contolled Inside and Out)
Akron High Rise Apollo Deck Gun
Rear Back-up Colored Camera System
Stop Bar on rear Bumper (emergency braking system)
4000 Gallon Portable Pond (Electric Rack)
Hale Chief 2 410 GPM Floating Pump
200' of 2 1/2" hose with Nozzle
2- 200' of 1 3/4" hose with Nozzles
Onspot Chains on rear Axle
4 Air Cylinder compartments
Large Colored LED Tank Level lights on both sides, rear
and a small one on the interior
2 - 3" Fill on rear with Storz connectors
Roll Up doors on all 4 compartments
4 Scene lights on each side
Code 3 Lighting Package
Hopefully we have built a excellent truck. When this truck arrives it will be fully equipped and ready for Service as soon as we ADD WATER !!!! It is coming with ALL (axes, nozzles, hoses, pike poles, everything) the equipment on it.
The Chassis is scheduled for delivery in July and the finished Product in October or November (Hopefully THIS YEAR)
Now---- The Problem---- Do we call it
"2 Tanker/Pumper 6"
"2 Pumper/Tanker 6"
"2 Engine/Tanker 6"
"2 Big Attack 6"
"2 Supertanker 6"
God this is so confusing ;D
2005 Mack Granite 4-GUYS
Mack 427 HP Motor
Automatic Transmission
Aluminum Wheels
LED Clearance Lights
4000 Gallons (Elliptical)
1250 GPM Pump
2 1/2" Front Discharge
3 " rear Discharge
10" Newton Dumps Side and Rear with 18" extensions
(Contolled Inside and Out)
Akron High Rise Apollo Deck Gun
Rear Back-up Colored Camera System
Stop Bar on rear Bumper (emergency braking system)
4000 Gallon Portable Pond (Electric Rack)
Hale Chief 2 410 GPM Floating Pump
200' of 2 1/2" hose with Nozzle
2- 200' of 1 3/4" hose with Nozzles
Onspot Chains on rear Axle
4 Air Cylinder compartments
Large Colored LED Tank Level lights on both sides, rear
and a small one on the interior
2 - 3" Fill on rear with Storz connectors
Roll Up doors on all 4 compartments
4 Scene lights on each side
Code 3 Lighting Package
Hopefully we have built a excellent truck. When this truck arrives it will be fully equipped and ready for Service as soon as we ADD WATER !!!! It is coming with ALL (axes, nozzles, hoses, pike poles, everything) the equipment on it.
The Chassis is scheduled for delivery in July and the finished Product in October or November (Hopefully THIS YEAR)
Now---- The Problem---- Do we call it
"2 Tanker/Pumper 6"
"2 Pumper/Tanker 6"
"2 Engine/Tanker 6"
"2 Big Attack 6"
"2 Supertanker 6"
God this is so confusing ;D